I’m talking today to Jamie Redman, BIM Manager at Michael Aubrey Partnership about BIM adoption and answering some of your frequently asked questions.

So we’ll start with the obvious question;

What Is BIM (Building Information Modelling)?

BIM is not to be confused with software.

 

BIM is actually a process of collating information so that it helps us describe the building in such a way that we can ensure that the design is buildable and check everything works in a virtual world before it gets really expensive checking it on site.

BIM Elevation image

 

 

 

 

 

 

 

 

 

 

 

What Is The Difference Between 2D CAD (Computer Aided Design) And BIM?

it is not as simple as one is 2D and one is 3D. It is not about software, it is all about process and intelligent use of information.

What Is CAD?

CAD – ‘individually drawn 2D lines’ –  for each view created, every line has to be drawn individually and there are no restrictions or checks to where these lines are drawn. Each view is, therefore, unintelligent and susceptible to errors.

More importantly, each view is drawn separately, one by one, and are completely unconnected from every other view. As such, discrepancies between views often occur and may not be realised until a project is under construction. These errors have the potential to cause expensive issues when they are eventually discovered.

BIM V CAD

BIM – ‘intelligent 3D objects’ – each view is not created individually, instead views are generated from a single 3-dimensional model. This means that the information shown on every view is entirely accurate and concurrent to one another.

In BIM a model is built using objects, a wall is a wall and not just a set of lines, and each object can be assigned data parameters. BIM is a tool that provides real time design checking using these data parameters. The 3D model can be checked to see how every object interacts with one another; junctions can be scrutinised for practicality of construction. As a result, designs cannot be ‘fudged’ just to look right without intention. This all means that designs produced in BIM are coordinated and thought out before they reach project construction.BIM Cut Roof

The use of the information collected within a BIM model is limited only to the level of data inserted. The potential of BIM, as a tool, goes far beyond that of CAD and can be used to intelligently collect, coordinate, process, analyse and produce design information that ultimately reduces risk and waste on site.

Why Do We Use BIM?

We insist on the use of BIM and recognise that it provides better quality and clarity, which, ultimately, saves you money. Drawings are clear, accurate and concise for your builder to price and build from and ensures that you are entirely aware of the extent of work involved. 

How Does The Process Work?

Following a feasibility visit, we provide you a quotation for obtaining Planning and Building Regulations approval. If you instruct us, we charge these as two separate fees.

Our process consists of creating a single BIM model that is used to produce both the Planning and Building Control information, which is developed further at each stage. This ensures that the design is coordinated and consistent throughout so that you can have confidence in your scheme. 

I Already Have My Planning Drawings In CAD. Can You Use These For My Building Regulations Submission?

We can use your CAD drawings as a template to start to build the model from, however we do not produce our information in CAD anymore because it does not allow us the benefits of BIM. We prefer to produce for you a higher quality of design to ensure it is entirely buildable and that you have the predictability during its construction.

Why Does It Cost More For Building Regulations Alone?

We endeavour to ensure that the design we produce in the planning stage is buildable and compliant with Building Regulations. Unless checked, someone could obtain planning permission for something that you cannot build or get building regulations approval for.

As our process of design starts at the earliest point, part of the building regulations work has already been completed within the planning stage. We use the same model for Planning to commence  Building Regulations process. If we are instructed to do the Building Regulations alone, we do not have a model to start from, whereas we would cost for doing that work in the planning phase.

What Does This Mean For You?

Clarity of Information

We provide full detailed information on our plans, so it’s absolutely crystal clear what your builder has to build – they will then price for what you need.

In our experience, if drawings do not have clear, concise details and information you will end up paying far more for your extension in builders fees than if you had paid for a properly thought out design at the beginning of your project.

Built In A Virtual World

Effectively we are building in a virtual world, checking staircases will fit, walls and roofs will align etc, all before your builder starts working on site.

Loft conversion BIM image

Testimonial From A Local Builder

Builders like our designs as they are clear and accurate and they can price your project accurately.

What does this mean for you? You can be confident that the price your builder quotes you includes everything that is on the drawings and detailed specification. No hidden “extras” at a later date, keeping you within your budget.

Here is a testimonial from a local builder;

“The more information we can get on the drawings, the more accurate we can be with our quotation, which means that the customer will only pay for what was on the original quotation.”  Click here to read more.

Want to learn more? This excellent video from our friend Fred Mills at B1M describes what a BIM model is in less than 3 minutes.

Are you planning a project? Please give us a ring on 0118 962 9666 to see how we could help you.

Join John Staves, Richard Lane and Tina McGeachan for our Fourth Thames Valley BIM Hub Event!

BIM Hub

 

 

BIM Technology Showcase

When? Monday 6 October 4:45pm – 7pm
Where? Whiteknights Campus, Reading

Hosted by: The University of Reading, Design Innovation Research Centre, School of Construction Management and Engineering

Seven technology providers will demonstrate the capabilities of their products and describe their different functions and how they fit within the exchange of information cycle. Short presentations with plenty of time for questions will provide you with a general overview of BIM related software.

Autodesk               Pam Bhandal
Bentley                  (to be confirmed)
COMIT                   Iain Miskimmin
Graphisoft             Andrew Norrie
Solibri A                 lan Baikie
Tekla                      Duncan Reed
Vico and Trimble  Laura Brown

Visit the BIM CAVE: Dr Maxwell Mallia-Parfitt

Our hosts, the University of Reading, are also offering the chance to experience total immersion within a BIM model. In the BIM CAVE (Collaborative Automatic Virtual Environment) graphics are projected in stereo onto three walls and the floor and viewed with active stereo glasses equipped with a location sensor. As the projector screens form a room sized environment, it is possible to have multiple users stand within one-to-one scale recreations of BIM and CAD models, which enables collaborative discussion, viewing and navigation of the model in real-time.

What Are BIM Hubs?

BIM Hubs are part of a national and regional network established by CIC to promote a consistent understanding of what BIM means to the industry and its impact through all levels of the supply chain.

The resounding strapline to BIM is that we need to work better together and the Thames Valley BIM Hub meet regularly to:
•share BIM knowledge and best practice
•facilitate collaborative activity – helping companies to meet ‘BIM Buddies’
•support the development of the supply chain’s BIM capabilities
•increase BIM capacity across the region
•ensure regional input into national discussion and policy decisions

BIM is the future, so whatever your interest or level of involvement, please join us!

To book your place contact: Julian@secbe.org.uk

There is no charge for this event but do please let Julian know if you book, but are subsequently unable to attend.