On 6 April 2016 we successfully passed our ISO 9001 : 2008.

John Staves, Managing Director said

It was a great visit, with Dave Silcock, the Auditor, being very complimentary about the changes we are making to our systems to develop our service delivery clearly demonstrating our commitment to continuous improvement – the principle at the heart of ISO9001.  Our customers should benefit from the clarity that the changes will provide.”

Over the next 12 months we are embarking on the transition to ISO 9001 : 2015.

A great result for all of our team and our customers!

A fantastic night celebrating the extraordinary work of Structural Engineers across the world!

The winners and commended projects were announced during The Structural Awards ceremony, held at The Brewery on Friday 13 November.

The evening culminated in the presentation of The Supreme Award for Structural Engineering Excellence which was awarded to the Singapore Sports Hub, by Arup.

Martin Powell, Chief Executive at The Institution of Structural Engineers, said:

Once again The Structural Awards have delivered a magnificent illustration of the extraordinary work of structural engineers – preserving engineering heritage, finding solutions to the complex demands of the modern world, and shaping the future of our urban environment. This spread of winners illustrates the vital contribution engineers make as creative, innovative problem solvers and the guardians of public safety.

Click here to find out more about all of the Winning and Commended projects from this year’s Structural Awards.(link expired)

From the Institution of Structural Engineers website.

Returning from a very busy week on the “Ask an Expert” panel at Grand Designs Live I was going to write a blog post about the seminars that we attended and the insightful debates that emerged. I was planning to talk about the new products that were on show and some of the new construction techniques that are reducing carbon wastage and making construction methods safer and more efficient.

However, I came away with a much more important message to share, as it kept occurring time and time again.

Setting the Scene

Let me set the scene.

Grand Designs NEC 2015 ASk an expert

Over the period of four days we had appointments with over forty individuals. Mainly home owners excited about the prospect of their very own “Grand Design”.  They ranged from removing a single beam in a house to new build “Grand Designs” in France and Tuscany.

People bounced up to our desk, wide eyed and happy as they eagerly showed us their plans. So much time and thought had got them to this point.

As far as they were concerned they just had a few structural issues that they wanted to discuss before work could start on site (in some cases they wanted a second opinion about a structural solution that had already been proposed).

We sat and listened as they told us how they were so pleased that they now had obtained Planning Permission, they were one step closer to their dream home, just some structural issues to sort out.

Listening

We let them talk .. we listened.

Time and time again we saw their faces drop as we calmly explained that

Yes –  the designs were amazing

Yes – the designer had obviously listened very carefully to what they wanted from the design.

But ….. and it was a big “but”.

The designs weren’t buildable ..

Well what we actually said was;

anything can be built structurally, but it will cost you a lot of money”

To give you just one example. A young couple had appointed an Architect to design them a new build, detached five bedroomed, three storey house. It looked amazing!

Listened to Their Brief

The Architect had clearly listened to their brief and they were very pleased with the design that had gone through Planning and had obtained full Planning Approval without too many problems.

They had booked an appointment to see us to find out what they needed to do to obtain Building Regulations Approval.

When we looked at the drawings, there were no internal load paths. The walls at first floor did not line up with any load bearing walls, a similar situation on the second floor. There were a few lines where beams needed to be “designed to engineers calculations” however, some were missing altogether.

The design was buildable, but at what cost?

Unfortunately, this seemed to be a common reply to a high number of visitors to our sessions.

So What’s The Answer?

We know this doesn’t apply to all designers, but time and time again this is an issue that we are experiencing.

The Structural Engineer comes to the party too late.

Imagine if the engineer was involved at an earlier stage .. to work up the design with the Architect .. possibly even “collaborating” with them …..

I’ve had this discussion with many Architects and I get the same response

the Client doesn’t want to pay for the full design at the initial stage as they might not obtain Planning permission

I make the point that the designer should have a fairly good idea whether or not Planning permission would be granted.

We are not suggesting a full detailed design at an early stage, just some conceptual ideas that would make the design buildable at a later stage.

Collaboration and Communication

The designer’s focus is on;

      function and the aesthetic of the project – how it looks, how the users experience it, how it feels to         be in the space.

Engineers are looking for;

      the most cost effective solution that is the most functional.

I believe that Clients ultimately benefit from a well thought through scheme. What’s s the point of getting planning permission for something that is disproportionately expensive to build?

By working together at an early stage, Architects and Engineers can apply their specialist knowledge and experience to deliver a cost effective solution which meets the Clients brief.

Would your Clients benefit from engaging a Structural Engineer at concept stage? When do you typically engage a Structural Engineer? Would be very interested to hear your thoughts …

We are thrilled to announce that we have been selected again to provide Structural Engineering advice at “Grand Designs Live” as part of UK Construction Week at the NEC, Birmingham.

Click here to be in with a chance to receive FREE tickets to this years “Grand Designs Live” event!

UK Construction Week is the leading industry event for construction and building professionals, with overwhelming support from associations and trade bodies from across the industry, as well as big name exhibitors and hosts for its comprehensive seminar programme.

  • 55,000 + construction professionals attending
  • 600 + trade visitors with over 10,000 products and services
  • 9 Construction shows under one roof
  • 19 free “hands on” workshops
  • 45 hours of free BIM workshops
  • Gain valuable CPD points from free seminars
  • Free beer festival, casino night, bacon roll breakfast and award ceremonies

Bringing together nine shows under one roof, the event will feature the Build Show, incorporating Civils Expo, Timber Expo, the Surface and Materials Show, Kitchens & Bathroom Live, Plant & Machinery Live, Energy 2015, HVAC 2015, Smart Buildings 2015 and Grand Designs Live.

Ask an expert

Kevin McCloud

ask an expert

 

 

 

 

The event will play host to 1,000 exhibitors and more than 55,000 visitors, giving exhibitors valuable face-to-face time with active buyers, specifiers and decision makers from across the industry. For visitors, it provides the opportunity to speak to suppliers and manufacturers from a wide range of diverse industry sectors, all in one place.

UK Construction Week is also fully supported by the industry’s leading trade groups and associations, some of which include the Construction Products Association (CPA), the National House Building Council (NHBC), the Building Research Establishment (BRE), the Royal Institute of British Architects (RIBA), the Renewable Energy Association (REA), the Royal Institute of Chartered Surveyors (RICS), the Society of British and International Design (SBID), the Timber Research and Development Association (TRADA) and the Zero Carbon Hub.

We’ll be there 8 – 11 October – are you coming? would be great to see you!

On Friday 18 September we welcomed Dr Phillip Lee, MP and his constituency managers, Ian and Rowena Collard to open our new offices in Finchampstead. We were joined by past customers, suppliers, and local businesses for a relaxing afternoon full of good conversations and a light lunch.

Talking about the event John Staves said,

“I am delighted that so many of our customers, past and present, suppliers and local businesses were able to join us to celebrate our new office premises. This new office space allows us greater flexibility to grow our business over the coming years”.

Opening the office, Dr Lee said,

“I am always keen to support local businesses and it’s great to see Michael Aubrey Partnership looking to the next stage to becoming bigger and more successful – without businesses like this where would we be”.

It’s great that you started from a flat in Bracknell and now you are here having purchased this building – a fantastic story. I’m very proud to cut the ribbon and officially open this building.”

John gave special thanks to members of his team, some of whom have been with us for 15 + years and for the support of past and current customers.

A relaxing afternoon had by all!

 

Listen to John Staves talking to BIM Crunch Editor, Jack White on their popular “Company Spotlight” feature.

Find out how an SME adopted BIM in the middle of a recession and the risks that presented and how an SME utilises BIM on ALL projects and more.  Click here to listen to the four-part interview, or read extracts from the interview below! (link now expired).

Welcome to a very special audio edition of Company Spotlight, the popular feature that enables you listeners to learn about the past, present and future of a BIM-related business. Today, I am going to be chatting to the Managing Director of Michael Aubrey Partnership Ltd., a structural engineering SME who have been utilising BIM on ALL of their projects since 2009. Please welcome John Staves, hi John!

Hi Jack, thank you for inviting me to talk to you.

It is a pleasure to have you hear and I know that it would be a pleasure for me to hear you give a brief summary of Michael Aubrey for the listeners. Can you discuss the origins of the business and maybe reflect on some big moments for the firm in its history?

Michael Aubrey was formed back in 1994 to deliver the right structural design information to the right people at the right time for the project.  I’d had a good blend of consultancy, contractor and client experience.  Sometimes as the Client we bought in structural consultancy to supplement the small in-house team capability.  My experience of the industry from the Client perspective was not good – suppliers wanted to deliver the job how they always did, rather than listening to our requirements, which were not for calculations and drawings – we needed the building completed for the business to operate from.  There was a lack of willingness to engage, to collaborate.  So Michael Aubrey came about to change this, to work in a better way.  So by 1999 we’d got to the point where the only staff were the Directors, but we were outsourcing a huge volume of the work we were winning.  We were becoming administrators.  After some discussion, we made the decision to employ, and our first employee started on 1 January 2000.  We grew quickly on the back of some niche work in telecommunications base station roll out projects.  Then in 2002 there was a bit of a slump in that sector as the licensed operators adjusted their plans.  Fortunately we had a broad spread of consultancy work by then – in building structures as well as the telecommunications work. In 2009, we faced the same challenge as many other practices with recession, but managed to avoid the compulsory redundancies and pay cuts that many suffered, but the business reserves were depleted.

I touched upon how long that Michael Aubrey have utilised BIM for in the introduction there and whilst you began implementing it in 2009, you first identified the positives that are born as a result of BIM in 2007. How did you discover BIM and was the process hard to implement within the company? Was it very costly and time-consuming?

Back in 2007, when everything was going well, confidence was high and project scale was increasing, we were looking for some improvement to our structural analysis and design tools.  One of my team came to me and said he had seen a tool called Revit which merited a look.  At that time, Revit was the product of a standalone US company.  We did some research and although it didn’t do what we wanted immediately, we could see the potential for it to help with our basic philosophy of getting the right design information to the right people at the right time to make the project go well.  So what came about was that we purchased Structural software that linked to Revit.  By the time we moved to look at adopting Revit in 2009, Autodesk had acquired the company and started to develop it.  The process to adopt BIM was very easy for us because it facilitated our collaborative style and desire to make the project work.  The direct costs of the tools and training were painful as the recession ate into reserves, but in reality were down to a core team, we had real time available to develop the skills.  I really think that not taking what was a bit of a leap of faith back then would have probably cost the business.  So yes, there was a short term financial pain, but the value, the return on the investment has been exceptional with last year being one of, if not the most, successful years in the business.

To strengthen your BIM offering for clients, Michael Aubrey believe that change management is a crucial part of facilitate the BIM process and helping your clients get up to speed with BIM quicker. Can you explain that methodology?

It’s all about attitude.  If people don’t genuinely want to collaborate for the good of the project, BIM alone can’t solve that.  It’s like when you interview for staff; you need the right basic skills, but probably most important is the attitude.  So the first part of a successful adoption of BIM is doing it for the right reasons.  If you adopt BIM because your Client says I want you to do BIM, or under sufferance because you have to do BIM to win work, your projects won’t be anywhere near as successful as those with parties who genuinely want to collaborate.  Like any successful construction project, it all comes down to the relationships between the individuals and their attitude to collaboration.  So it follows that you need to get peoples attitude and relationship right before starting.  This can be achieved by good alignment of rewards.  Just telling people to collaborate won’t help!

Your team at Michael Aubrey utilise BIM on every single project that they do. Whilst many people may think that some projects are just too small to bother using BIM for, do you see those smaller projects as opportunities for your team to gain BIM experience?

They clearly are good experience for new members of the team, but that isn’t why we do it.  We do it because efficiency and design quality are improved.  Because there is a level of automation to production of the design drawings (and yes, Clients and builders still expect to have drawings!) more of our fee time is spent refining the design to make it simpler or easier to build, which saves the Client money and delivers what they want.  And of course that leads to good referrals and helps deliver growth.

What are some of the BIM projects that you are most proud of?

Headmaster’s House – This project was a house with tricky foundations as it was partly built over an old outdoor swimming pool.  We worked for the design and build contractor, but none of the supply chain had any experience of BIM authoring tools.  So we worked with each party to develop their model for them, using an innovative process behind the scenes.  We then brought all the separate models together for coordination and published the construction information from the federated model.  The result was an early finish, on budget and with zero snags at handover.

Nine Mile Ride School was a small extension project.  Having taken the scheme through planning and Building Regulations, rather than tender and administer the contract, the school asked us to bid for the build.  We won the contract, delivered on budget on time and with zero snags.  The school had assumed we would be late and booked their carpets and furnishings for the following week, so they had a week of float, but all was ready for the new term as planned!  We have now been asked to help with planning another area of their buildings and working out a phased implementation plan to run alongside available devolved capital budgets.

We are just a few months away from the UK Government’s 2016 mandate. Do you think Michael Aubrey Partnership is ready for March 2016?

We have been ready for some time, but finding fully collaborative teams capable of working to level 2 is virtually impossible.  But that is why we worked like we did on the Headmaster’s House project – to facilitate the benefits of BIM without the perceived problems.  We can offer a similar service to others.

Do you think that people are taking the mandate, and BIM in itself seriously enough? Do you think a lot of people still need to wake up and understand the power of BIM?

I think there is a still a lot of misunderstanding out there.  People are still looking for short term what’s in it for me answers.  BIM facilitates collaborative working.  It is not some magic wand which makes construction more efficient, designs better and operational costs lower.  But if you genuinely want to work collaboratively, it is a great tool.  I actually think that the main benefits come from the collaboration and traditionally, that is not how the construction industry works.  The real problem is not BIM, it is the need for change in the way the industry works.  Like with any change, there is the issue that if attitudes are wrong, the benefits won’t be realised and the people who resisted change will say told you so!  The self-fulfilling prophecy conundrum.  But do you know what?  Businesses can’t stand still.  They either change, adapt and develop, or resist change and fall back.  The same goes for our construction industry.  We have historically exported construction skills around the world, but going forward the new world competition will overtake us because they are better at changing, better at adopting new technology and methods and don’t have the baggage that the UK has.  So yes, a lot of people still need to wake up and understand the implications of not changing how they work.

What would your advice be for businesses that are maybe similar to you, or those who involved in different stages of a project lifecycle, who are yet to reap the benefits of BIM?

Just get on with it.  If you genuinely want to deliver better projects through the capital phase and provide better handover information to the operational phase, what are you waiting for.  Your Clients will value the outcomes.  Imagine if you consistently delivered on time, on budget, to quality just as we have on the projects mentioned earlier?  Would your Client’s not order more work from you or tell everyone they know about you.  How would that affect your career and your business?  Wouldn’t it be more fun to be part of projects where everyone collaborates and delivers what the Client needs for their business, without all the adversarial squabbling that construction is well known for?

Elsewhere in the industry, you were recently recognised at the RICSBIM4SME Awards, and were nominated in the Best SME Innovation category. How did it feel to receive recognition for your efforts?

Brilliant.  The team work hard to deliver high quality designs to our Clients, but more than that, this recognised our contribution to finding better ways of working .

The nomination was related to your Headmaster’s House project, quite brilliant in that neither the client nor his supply chain used BIM yet the project was done successfully to Level 2. What do you think this project demonstrates that others can be influenced by?

Simply, that it is all about working together, not about adopting some new piece of technology.  One of the sticking points seems to be that there is an assumption that all parties in the supply chain from Client to specialist sub-contractor have to be using BIM authoring tools.  That is not the case.  By working with a supplier like us, Clients and Contractors can gain the benefits of BIM without imposing BIM authoring on all parties involved.

What is next for Michael Aubrey as the 2016 mandate looms ever closer?

We are actively developing our ways of working to get more use out of the data.  From simple three dimensional coordination and scheduling from the models to cost planning and programme management including test builds and FM data output, the next shift in value will be using the model data as fully as possible.

We are also talking to specialist sub-contractors about developing parametric objects of their components.

A key area of development is to help Clients to unlock the potential that they can see is there with BIM.  At the moment, it seems to be Contractors who are recognising the potential and gaining the rewards.  We want to help Clients engage with BIM so that they can gain the benefits.  We are increasingly hearing ‘we want to do BIM‘, but with little understanding of what that means.  As devotees of collaborative working and experienced BIM users, we are well placed to bridge this knowledge gap and deliver tangible benefits.

Are you ready for 2016? If not, what is the main reason that you haven’t introduced BIM into your organisation?

Congratulations to the RICS and the team at BIM4SME for organising such an enjoyable night!

The delightful setting for the evening was the Westminster Boating Place and our enthusiastic host for the evening was Stefan Mordue from the NBS.

Stefan welcomed everyone to this, the RICS BIM4SME’s inaugural Awards event, unique in the industry because they recognise the hard work & achievements of small and medium sized enterprises.

Stefan talked about the strong sense of community that had built up around BIM and the positive role that social media had played facilitating the exchange of ideas and working as a tool for collaboration.

The BIM4SME Awards showcase excellence, promote best practice and highlight the tremendous opportunities BIM presents to small and medium sized businesses.

We are thrilled to have been part of these Awards as finalists in the “BIM SME Innovation” category. RICS_BIM4SME_Shortlisted_Banner

Matt DcDermott, from the RICS opened the evenings speeches followed by Tim Platts, Chair of the BIM4SME working Group.  “Being able to respond quickly, showing flexibility in working patterns and seeing BIM as an opportunity for growth for SME’s”  were key themes of the evening.

Other high profile speakers addressed us, including Chris Chivers, Vice Chair of the Chartered Institute of Building (CIOB) and Richard Saxon CBE, Chair of the Judges (and former Chair of BDP)

Congratulations to all the finalists and winners.

The Winners of the Awards
Best BIM Project, Medium enterprise (51-250) – Bond Bryan Architects
Best BIM Project, Small enterprise (1-50) – Howard Russell Construction
Best SME BIM Blog – Bond Bryan Architects
Best BIM SME Website – Atom Publishing
Best SME Newcomer – Baxall Construction
Best SME Innovation – Specified By
Best SME Training Strategy – Coombs Ltd
Best SME Engagement and Support Programme – Imarati Engineering

Here are a few images from the evening.

“Live blogging” from the event was by Su Butcher, to find out why these awards matter to the industry, take a look at her blog The First BIM4SME Awards

Are you an SME in the construction industry, are you using BIM? Leave me one word that describes your experience.

Photographs MAPL, BIM4SME, RICS

Proud and thrilled to see John Staves, Managing Director at Michael Aubrey Partnership, receive the “Lewis Kent Award” for his dedicated service to the Institution of Structural Engineers, through his work on the Board, including as Honorary Treasurer, Council and the Thames Valley Regional Group and his contributions to Committees, Panels and Task Groups over the past 20 years.

John was presented the Award by Martin Powell, Chief Executive at The Institution of Structural Engineers at the RSA House, London on 4 June 2015.

dungeon

 

This Award forms part of “The People and Paper Awards” celebrating the accomplishments of exceptional individuals and teams in the field of Structural Engineering.

Awards presented at this ceremony include; the achievements of young members of the Institution of Structural Engineers, excellence in education and papers published in The Structural Engineer, alongside those who have made outstanding contributions to the profession.

The Lewis Kent Award is presented for personal services by a member to the Institution or the profession, chosen by The Nominations Committee.

Who was Lewis Kent?

Lewis Kent became President of the Institution in 1959. He was an early recipient of this Award which, from 1973, was re-named in his honour.

Speaking about receiving this prestigious Award, John Staves said,

“I am passionate about Structural Engineering. I am thrilled and delighted to receive such an honour in recognition of the contribution that I have made to the profession over the last 20 years”.

To read more about the Awards click here.

We are delighted to advise you that we are expanding our business and moving to larger premises as from Friday 22 May 2015. Our new offices are approximately a 15 minute drive away from our old office and are located in the South of Wokingham.

Some Facts;

  • New address: 6 Ivanhoe Road, Hogwood Business Park, Wokingham RG40 4QQ
  • Telephone numbers have not changed: 0118 962 9666
  • Email addresses: fingers crossed our old email addresses will still continue to work,

Why move? We are growing steadily and we had outgrown our office in Maiden Lane

What’s so good about the new premises? It’s over 2 floors and we have lots of space, easy parking, large, fully equipped meeting room with room to expand over the coming 12 months

What Does Michael Aubrey Partnership Do, Anyway?

We are Chartered Structural Engineers and BIM Modellers operating across the UK.  We deal with individual projects between £500 and £200M in value and we have experience in most aspects of construction work, specialising in structural engineering. Please take look around our website for more information (mapl2.wpengine.com).

Can I Come And Have A Look?  We would love to show you round – please pop in when you are passing.

 

 

The RICS BIM4SME Awards finalists have been announced and we are thrilled to have been shortlisted in the “BIM Innovation” category.

The RICS BIM4SME Awards 2015 recognises and promotes SME’s role and achievements in the UK’s adoption of BIM. The Awards aim to spread awareness, promote best practice and highlight the tremendous opportunities BIM presents to small and medium businesses.

In the category of “BIM Innovation” we entered our case study, The Headmaster’s House, Oratory school. In this project we were able to help our Client and his existing supply chain, deliver a BIM level 2 project on time, on budget with zero defects.

Neither our Client, nor his supply chain used BIM.

This was made possible by the innovative way in which we “modelled” the existing supply chains’ 2D drawings and brought them together in one federated model.

The innovative process we developed will compete against other finalists at an Awards ceremony on 18 June at Westminster Boating Base, London.

Are you attending the event? Please come and find us.